4T Oil 15W40 1 Liter
- For 4-stroke gasoline engines
- Suitable for all fuel types.
- 1 liter
€14.97 VAT incl.
The pressure washer Ayerbe Ay-170 KT BXD mounts a 4-stroke gasoline engine Kiotsu model KT 210, capable of generating up to 208 cc of displacement operating at 3400 revolutions per minute.
As for its water pump, we can say that the pressure washer is equipped with a BXD model Comet model BXD, which has a thermal safety valve as its most outstanding feature.
The pressure with which this pressure washer is able to expel water is 185 bars, the maximum flow rate is 600 liters per hour and the nozzle is of simple type.
As standard the pressure washer includes an 8 meter hose, a 700 mm lance and an AL 55 gun so that you only have to plug it in and put it to work.
Finally, the Ayerbe Ay 170 KT BXD weighs only 37 kg which makes it a good option to consider if you are looking for a cheap and powerful pressure washer.
Pressure | 185 BAR |
R.p.m. | 3.400 r.p.m. |
Flow | 600 L. / H. |
Pump | COMET |
Start | Manual |
Nozzle type | Single nozzle |
Noise | 95 LwA / 72 LpA@7m |
Motor | |
Brand | KIOTSU |
Model | KT-210 |
Power | 6.5 HP |
Displacement | 208 cc |
Cooling system | Air |
Engine oil type | SAE 20W40 / IPE grade CD, CF |
Intake | Natural |
R.P.M. of engine | 3.600 r.p.m. |
Speed governor | Mechanics |
Fuel | Gasoline |
Fuel consumption at 75% | 1.1 L/H |
Oil capacity | 0,60 L |
Starting system | Manual |
Pump | |
Brand | COMET |
Model | BXD |
Type | Axial |
Flow rate | 600 L./H |
Pressure | 185 BAR |
Hose included | 8 M |
Includes lance | 700 mm |
Includes gun | AL 55 |
BXD pump | With thermal valve |
Thermal safety valve | Including |
Dimensions and Weight | |
Tank capacity | 3,1 l |
Autonomy at 75% | 2.8 hours |
Weight | 37 kg |
Dimensions | 560 x 750 x 440 mm |
Packing volume | 0,18 m³ |
IMPORTANT NOTICE |
It is mandatory for the customer to check oil and grease levels before start-up. If it is not possible to check the goods at the time of receipt, it must be indicated on the carrier's sheet that the customer is in agreement unless an examination is pending. |
Data sheet
Specific References